Scheme Evolution
Since 2005, consultation and a pro-active approach to community involvement has informed the brief and the design process. The results of the first phase of consultation on the masterplan were the inspiration and foundation behind the initial detailed designs for Site A, which were displayed in March 2009.

Click for larger version (opens in a new window)
From March 2009 onwards a detailed programme of targeted consultation was put in place, presenting the scheme to key stakeholders and the local community. The proposals were well received and resulted in comments and feedback which were fed back to the design team. In response, additional revisions to the design have been made and updates continue to be presented to the community. These amendments incorporated into the revised design now form the basis for the detailed planning application which has been submitted to and registered by the London Borough of Southwark.
| Consultation Query | Design Amendment |
| Reconsider unit numbers and heights across the blocks |
Reduction in density
Height changes across the blocks
|
| Reconsider the height along the Pumphouse path |
|
| Reconsider the lack of 4 bedroom properties and houses |
|
| Courtyards in each block look too small and concerns on sunlight |
|
| Provision of bicycle facility |
|
| Façade of Block A1 not very interesting |
|
| Community facilities |
|
| Reconsider proportions of tall building |
|
| Retail facilities |
|